Ipswich Sluice Refurbishment

On behalf of the Environment Agency, KGAL has been appointed specialist sub consultants through Halcrow for the Ipswich Sluice Refurbishment. Ken Grubb is the nominated ECC Project Manager and Brent Imisson is the nominated ECC Site Supervisor. The scheme comprises 2 vertical lift wheel gates (rope drum and actuator operated) plus one flap gate (actuator & screw operated). The refurbishment includes removing the gates for structural repairs, new seals, operating gear refurbishment and painting.

Back to ListingPrevious